Showing posts with label brickwork. Show all posts
Showing posts with label brickwork. Show all posts

Tuesday, 14 September 2021

Brick Arch Former

 It's not been dry enough to do much on the cob oven, it needs more time to dry out (although I have done more since the last post).


So my eldest daughter and I decided to make a wooden former for the arch over the entrance, a nice simple project we could do together. 

Saturday, 24 September 2016

Shared Meals

My bricklayer, Dill, has been working hard on our extension and it feels that we're making progress now that we're out of the ground. I've even got the scaffold booked for a weeks time! 

The other day he was going to work late as he had to start late, so I offered him a evening meal with the family (he often has lunch with us when he's working here).
Focaccia from the other night
I like our girls (and boy) to eat with as many friends and family as possible, sat around the table I think it's really good for them and helps improve their manners. My youngest daughter is a little bit besotted with Dill anyway and has named one of her Duplo figures "Dill" who goes on lots adventures building towers. 
"Dillster" working hard! 
I also think it's essential that they treat people working for us how they want to be treated, a Polish friend of mine says that in Poland if you have builders working for you then they eat with you each lunch time. 

A really strong memory I have growing up is lots of people eating with us as a family, kind of like a stereotypical image of a farm kitchen. Anyone working or helping us on the farm on a Saturday used to have chips with us on a night time and dad even does this for his workers on a Friday lunch time now, my mum also does a big meal around Christmas for everyone that works for them (a great fun evening!) as well as a cooked breakfast on a Saturday. These memories are all noisy, fun meals filled with laughter, part of the reason I've always wanted a big family. 

I'd like to have more people eat with us, not for showy meals but for everyday run of the mill meals, and hopefully with a bigger house we should be able to do it more often. 

Do you like to have people round to eat?
Do you enjoy big noisy meals?

Sunday, 18 September 2016

Extension Progress - Slab Poured!

My dad and I have had a few busy weekends wince the last time I wrote about the extension! 
Easiest to go through it in pictures:
The cavity under the ground level has been filled with a light concrete mix

Drainage has been added, pea gravel around all pipes.
I also built a man hole from scratch.

Drainage in the house surrounded by peas gravel and hardcore added to the slab

Wackered base

Sand blinding added so the plastic won't get damaged

Plastic added - this made a huge play pen for the youngest! 

6 inches of insualtion added to be under the concrete floor

Plastic to go between the insualtion and plastic as well! (build regs requirement) 

Wet concrete being laid - the grid pattern is the reinforcing in the concerete slab

Tamping the concrete roughly level - to lay the concrete we also had the help of one of dads workers Andy!
Got it mixed and laid in an afternoon.

Floating up the concrete late at night

A nice finish on the concrete - this will be the tiled floor of the kitchen eventually! 

It's certainly been busy around here! 
Yesterday and today are being spent getting ready for Dill the brick layer who is coming tomorrow. I've load the slab out with blocks, got all the starter bars in the walls, moved bricks so they're nice and close and made sure he's got plenty of sand and cement. Anything to keep him efficient and save me money! 
Exciting times now - can't wait to see this going up! 

Saturday, 27 August 2016

Extension Progress - Brickwork Up To Damp

So we managed to get a little bit further with the extension this week. Dill, my bricklayer, came for a few days and managed to get the brickwork up to Damp course and start laying some slabs on our patio.
Dill - the bricklayer
 The first day we spent a few hours making sure we'd accurately set it out. To help keep costs low I made sure that all the materials he needed were close to hand and I'd already made the "goal posts" that bricklayers use for setting out buildings. 
Goal posts for setting out the footings and blocks close by

Brickwork up
Now I've got the task of getting the drainage in place before filling the internal with the right layers of stone, insulation and then concrete. That means lots of work before he comes back! 

Saturday, 23 May 2015

Wobbly Wall - An Unexpected cost

We've started doing a bit of landscaping to the back garden. There are things that need doing for the extension like drainage, new man holes a new retaining wall and steps for the patio so I've been trying to make a start on them. 
Although the original house was built in the 1940's by a top quality building firm, a firm that came later and did some landscaping were not of the same calibre. 
 All the walls holding up the patio are crumbing away, one manhole was built in the middle of a wall and the garden wall that runs about 8m down out garden was only built the width of one brick on footings that aren't much wider. 
Now we've removed a huge invasive shrub we've discovered that this wall is not very stable. It's about 7ft high and you can make it wobble by pushing it with one finger. I doubt it'll be up much longer if there's a storm
 I did consider differnt ways of firming it up. We could add concrete pads and then build up buttresses at intervals to support the wall, or maybe drive steels down into the ground and fix the wall to that, we could even replace it with a wooden fence. But that would be half measures really so after a bit of head scratching we've decided to take it down and re build it properly. I like having a wall rather than a fence there as it feel more permanent and provides a lot of privacy for the patio.
The good news is that I spoke to the neighbour and he's agreed to go halves on it if we make his side nice as well - his side currently looks awful, it's not even pointed up and he says it's bothered him for years. 
It's a major extra cost, there is over 2000 bricks to purchase let alone the labour to lay them, plus the footings and the time loading the materials out. It's one we hadn't budgeted for and it only really takes us back to where we started with this wall but at least if we do it right it should never need replacing again and provide years of privacy.

What would you do in our situation? 
Related Posts Plugin for WordPress, Blogger...